Specifying a Bedside Table Range for Furniture Retailers
A bedside table is a small item with several jobs: it must relate visually to the bed, provide a useful surface and fit within the customer’s room. A retailer’s brief should make those requirements clear to the manufacturer before a sample is approved. The same drawing can support a more accurate catalogue and delivery discussion later.
Define the range and placement
Identify each table by product code, overall dimensions, finish and intended bed collection. State whether the range is sold individually or as a pair. If left- and right-hand designs differ, explain the viewing convention and mark the differences on the drawing rather than relying only on filenames.
Show the table beside the proposed bed and note any headboard or wall feature that affects placement. The table height, footprint and drawer access should be considered together. Customers must measure their actual rooms; a showroom arrangement cannot establish that the product fits every bedroom.
Describe the intended use
Explain whether the table is intended to hold a lamp, books, personal items or another category of objects. Ask the manufacturer to identify the proposed construction and provide product-specific information about intended use. Do not invent a load rating or claim that a surface is suitable for every appliance.
If the range is intended for a hotel or another project with defined performance requirements, provide the exact criteria to the supplier. The responsible technical team should review evidence for the actual design and configuration, rather than assuming a report for a different item applies.
Specify storage and access
List drawers, open shelves and compartments with their intended arrangement. Request usable internal dimensions where these affect the customer’s decision. Show drawer travel, handle projection and clearance needed between the table, bed and nearby wall.
Ask the manufacturer to identify runners, stops and any adjustable components. If hardware is replaceable, record its reference and the process for a future service enquiry. Availability and cost must be confirmed for the relevant order rather than promised indefinitely.
Coordinate the top and finish
Record the surface material, edge treatment, frame finish and drawer interior. Explain the intended exposure to common bedroom items and request care guidance for the supplied finish. Avoid describing a surface as scratchproof, waterproof or heatproof unless there is evidence supporting that specific claim.
Review physical finish references beside the bed, headboard and other pieces under representative showroom conditions. Different materials may respond differently to the same lighting. Record the approved references and the drawing revision; a shared colour name does not guarantee identical appearance.
Consider lighting and power separately
A bedside table may be used near a lamp or charging equipment. If a design includes a cable opening, show its location and dimensions. A furniture opening does not establish the suitability of electrical equipment connected by the customer.
If the product includes powered components, have the responsible qualified parties identify applicable requirements and review documentation for the actual configuration and destination. Clarify which party supplies and installs each component. Do not infer electrical compliance from a catalogue photograph.
Approve a representative sample
Where practical, inspect a complete sample with the intended drawers, handles, feet and finish. Compare it with the approved drawing and product schedule. Check drawer access beside representative furniture and record observations against the product code and revision.
If a proposed change affects the top, drawer arrangement or hardware, ask for updated documents and an assessment of any commercial or schedule effect. Obtain written approval for the actual change before production; approval of a finish swatch alone does not approve every construction detail.
Plan packing and delivery
Clarify whether the table is shipped assembled and how handles, feet or other loose components are packed. Request preliminary packed dimensions, weight and package count, and confirm final figures after the packing method is approved. The packing list should identify the correct product code and configuration.
For a Singapore delivery, the customer or delivery team should check the actual lift, corridor, doorway and turning space. Confirm who will carry, assemble and place the table and whether packaging removal is included in the actual service quotation.
Prepare a usable retail record
Provide sales staff with verified product and packed dimensions, materials, finish references and manufacturer-provided care information. Record the drawing revision and responsible contact for service questions. Before a repeat order, confirm material and hardware availability and document any approved change.
Price, minimum quantity, warranty, delivery and replacement-part commitments must come from the parties’ actual agreement rather than from a general guide.
Related: Furniture buyer questions · Contact the factory
